Info@rikair.com +233 542770207

Project Details

Service at Golder Start Resources, Bogoso

Tasks Carried Out

  • Removal of oxygen plant from operating location
  • Removal and Reinstallation of manifolds
  • Dumped old sieve and replaced with new sieve
  • Rebuilt all Jamesbury valves, actuators, solenoid valves
  • Cleaned and lubricated Regulators
  • Replaced Filter elements
  • Reinstalled generator into original location
  • Added valve at outlet of oxygen tank for test flow meter
    tested unit for conformity to specifications